Áù¾ÅÉ«Ìà Design Standards
The standards set out in this document are intended to serve as design requirements for the Áù¾ÅÉ«ÌÃ.
The design standards reflect the planning, design, construction and maintenance expertise of university personnel. These design standards apply to campus designs relating to new construction, renovation, renewal, and maintenance projects.
All of the concepts and procedures are for the use of designers and consultants. The use and inclusion of these standards in bid documents does not relieve the consultant or architect of the responsibility and legal liability for any bid documents created from these standards.
These standards are under constant review and revision. As changes, updates and new sections are incorporated, the version number and issue date will be updated. At the start of each project, prime consultants shall acknowledge the current version of the university design standards in use.
Staff and external architects and consultants are encouraged to put forward proposed revisions for consideration at any time. Please forward proposals and comments to: dsfeedback@ucalgary.ca.
It is not the intent of these standards to limit or confine the development and application of creative and innovative solutions. Where such alternative solutions, systems or approaches are being considered, a written proposal outlining the benefits, limitations, and total cost of ownership of the proposed solution shall be submitted to Facilities for formal approval by the appropriate technical authority within the university.
In developing these standards, the following guiding principles have been identified for all planning, design and construction projects at the university:
- Safety and security
- Accessibility
- Sustainability and environment
- Flexibility and adaptability
- Total cost of ownership
Design Standards
- 1.0ÌýÌý Introduction
- 2.1ÌýÌý Organization
- 2.2ÌýÌý Roles and Responsibilities
- 2.3ÌýÌý Other Campus Stakeholders
- 2.4ÌýÌý University Design Review and Approval
- 2.5ÌýÌý City of Calgary Approval Process
- 2.6Â Â Project Delivery (Under Development)
- 3.1ÌýÌý Overview
- 4.1ÌýÌý Institutional Sustainability
- 4.2ÌýÌý Room Acoustics
- 4.3ÌýÌý Vacant
- 4.4ÌýÌý Building and Site Safety
- 5.1Â Â Basic Construction Materials and Systems
- 5.2ÌýÌý Exterior Wall Systems
- 5.3ÌýÌý Roofing
- 5.4ÌýÌý Exterior Sealants and Caulking
- 5.5ÌýÌý Doors and Hardware
- 5.6ÌýÌý Glazing Systems
- 5.7Â Â Flooring
- 5.8Â Â Ceilings (Under Development)
- 5.9Â Â Interior Wall Types and Finishes (Under Development)
- 5.10Â Pending Standard
- 5.11Â Â Pending Standard
- 5.12Ìý Interior and Exterior Painting
- 5.13Ìý Signage and Wayfinding
- 5.14Â Furnishings (Under Development)
- 5.15Ìý Elevators
- 5.16Ìý Mechanical Systems
- 5.17Ìý
- 5.18Ìý Data and Voice Distribution
- 5.19Ìý Electronic Security Systems
- 5.20Ìý Landscaping and External Furniture
- 5.21Ìý Bicycle Parking and Storage
- 5.22Ìý Life Safety Systems
- 6.1Â Â Introduction
- 6.2ÌýÌý Instructional Spaces
- 6.3 Â Â Laboratory Spaces
- 6.4 Â Â Office Spaces
- 6.5 Â Meeting, Seminar and Collaboration Spaces (Under Development)
- 6.6Â Â Study Spaces (Under Development)
- 6.7 Â Â Public Spaces
- 6.8 Â Â Washrooms
- 6.9 Â Â Kitchen and Lounge Spaces
- 6.10 Service and Support Spaces
- 6.11Â Loading/Receiving Spaces (Under Development)
- 6.12Â Library Spaces (Under Development)
- 6.13Â Assembly Spaces (Under Development)
- 6.14Â Athletic Spaces (Under Development)
- 6.15Â Animal Spaces (Under Development)
- 6.16Â Residence Spaces (Under Development)
- 6.17Ìý Bio Bank Requirements
- 6.18Ìý Makerspaces
- 7.1ÌýÌý Confined Space Entry and Fall Protection
- 7.2ÌýÌý Hazardous Material Abatement
- 7.3ÌýÌý Commissioning
- 7.4ÌýÌý Vacant
- 7.5ÌýÌý Vacant
- 8.1Ìý Drawing Standard
- 8.2Â Drawing Standard Appendix
- 8.2.1Ìý Glossary
- 8.2.2Ìý Asset Naming Convention
- 8.2.3Ìý Equipment Standard
- 8.3ÌýÌý CAD Standard
- 8.4Â Â CAD Standard Appendix
- 8.5ÌýÌý BIM and VDC Requirement
- 8.5.2.1 BIM/VDC Consultant Requirement
- 8.5.2.2 BIM/VDC Contractor Requirement
- 8.6ÌýÌý Required Consultant Document Submission
- 8.7ÌýÌý Project As-built and Record Documents
- 9.2 Â Â Land Survey
- 9.5Â Â Floor and Roof Naming Convention
- 9.7Â Â Room Naming Convention